© 2025. The Trustees of Indiana University
Copyright Complaints
1229 East Seventh Street, Bloomington, Indiana 47405
News, Arts and Culture from WFIU Public Radio and WTIU Public Television
Play Live Radio
Next Up:
0:00
0:00
0:00 0:00
Available On Air Stations
Some web content from Indiana Public Media is unavailable during our transition to a new web publishing platform. We apologize for the inconvenience.

Battery parts maker Entek breaks ground on $1.5B manufacturing campus in Terre Haute

A Tesla charging station.
A Tesla charging station.

Oregon-based battery parts producer Entek broke ground Wednesday on a $1.5 billion manufacturing campus in western Indiana that officials said will create more than 640 jobs and give a boost to Indiana's growing electric vehicle industry.

Gov. Eric Holcomb joined Entek executives and others at the Terre Haute groundbreaking for the planned 1.4-million-square foot (130,064-square meter) complex, with Holcomb calling it “a great day for Terre Haute and for the state of Indiana.”

Entek, based in Lebanon, Oregon, makes battery separators for lithium-ion battery manufacturers. The company, which  announced the project in March, said its new Terre Haute manufacturing campus will produce enough battery separators per year to supply material for about 1.4 million vehicles annually.

“This decision cements Indiana’s leadership in the electric vehicle supply chain sector, and we are thrilled to partner with ENTEK to speed the commercialization of U.S.-built EVs," Holcomb said in a statement.

Entek is the only US-owned and operated manufacturer of wet-process lithium-ion battery separators, according to a news release on the groundbreaking. The Biden administration has been working to strengthen U.S. energy independence and reduce dependence on China for critical components.

Read more:  Ask The Mayor: Terre Haute's Bennett on tornado recovery, capitalizing on Entek, water park survey

Entek CEO Larry Keith said the company appreciates “the support we’ve gotten from President Biden and his administration as we bring together private and public sector.”

“Beating China on advanced battery development and production starts right here in Terre Haute, today,” he said in a statement.

Entek said the project will create more than 640 “high-wage jobs” by late 2027 in Terre Haute, which is located about 70 miles (113 kilometers) west of Indianapolis.